Tuesday, January 31, 2012

Field Report as of January 31, 2012

  • Existing concrete footings have been excavated.
  • Existing concrete stub columns, located in the proposed basement have been excavated.
  • Most of the site has been graded for site foundations to begin.
  • The proposed basement area has been excavated.
  • Existing fill parallel to South Florissant has been back filled as required.
  • Proposed corners of the building have been flagged.