- Existing concrete footings have been excavated.
- Existing concrete stub columns, located in the proposed basement have been excavated.
- Most of the site has been graded for site foundations to begin.
- The proposed basement area has been excavated.
- Existing fill parallel to South Florissant has been back filled as required.
- Proposed corners of the building have been flagged.